Silas Ray

Silas Ray is a 143 MW natural gas power plant in Cameron County, Texas, operated by Brownsville Public Utilities Board. EIA-860M lists 8 generating units here, inside ERCOT. Its units entered service between 1959 and 2004.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
142.5 MW
112 MW net summer
Generating units
8
In service
1959–2004
EIA plant ID
3559

Where it is

Loading map…
County
Cameron County, Texas
Coordinates
25.9131, -97.5214
Balancing authority
ERCO
Sector
Electric Utility

Units, technology and status

Operator of record
Brownsville Public Utilities Board
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine, Petroleum Liquids
Status
Standby/Backup (5) · Operating (3)

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 136 MW, Petroleum 7 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant Brownsville Public Utilities Board reports to EIA →

Silas Ray: FAQ

Where is Silas Ray?
In Cameron County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Silas Ray?
143 MW of nameplate capacity across 8 units, as of the EIA-860M release for 2026-07.
Who owns Silas Ray?
EIA-860M names Brownsville Public Utilities Board as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Silas Ray LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Brownsville Public Utilities Board here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silas Ray LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Silas Ray still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.