San Jacinto County Peaking Facility

San Jacinto County Peaking Facility is a 170 MW natural gas power plant in San Jacinto County, Texas, operated by East Texas Electric Coop, Inc. EIA-860M lists 2 generating units here, inside MISO. Its units entered service in 2001.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
170 MW
146 MW net summer
Generating units
2
In service
2001
EIA plant ID
56603

Where it is

Loading map…
County
San Jacinto County, Texas
Coordinates
30.4193, -95.0118
Balancing authority
MISO
Sector
Electric Utility

Units, technology and status

Operator of record
East Texas Electric Coop, Inc
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine
Status
Operating

Every plant East Texas Electric Coop, Inc reports to EIA →

San Jacinto County Peaking Facility: FAQ

Where is San Jacinto County Peaking Facility?
In San Jacinto County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is San Jacinto County Peaking Facility?
170 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns San Jacinto County Peaking Facility?
EIA-860M names East Texas Electric Coop, Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as San Jacinto County Peaking Facility LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — East Texas Electric Coop, Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "San Jacinto County Peaking Facility LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is San Jacinto County Peaking Facility still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.