Nuclear Power Plants in Connecticut

Every operating nuclear power plant in Connecticut as of 2026-07: 1 plants, 2 reactors and 2 GW of nameplate capacity across 1 county, most of it inside ISO New England.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
2 generating units
Nameplate capacity
2 GW
Counties
1
Grid operator
ISO New England
covers most of these plants

Map of nuclear power plants in Connecticut

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Nuclear · 1

List of nuclear power plants in Connecticut

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

nuclear power plants in Connecticut
MillstoneNuclearDominion Energy Nuclear Conn IncNew London2,259.921975Operating

Largest nuclear power plants in Connecticut

  1. 1MillstoneNew London County, Connecticut2,259.9 MW

Nuclear power plants by county in Connecticut

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
New London12,259.9

Nuclear Power Plants in Connecticut: FAQ

How many nuclear power plants are in Connecticut?
1, with 2 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Connecticut nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest nuclear power plant in Connecticut?
Millstone, at 2 GW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Connecticut?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Connecticut's nuclear power plants?
Most of them sit inside ISO New England, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.