Nuclear Power Plants in Georgia

Every operating nuclear power plant in Georgia as of 2026-07: 2 plants, 6 reactors and 7 GW of nameplate capacity across 2 counties.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
2
6 generating units
Nameplate capacity
7 GW
Counties
2
Grid operator
Mixed
no single ISO covers a majority

Map of nuclear power plants in Georgia

Every one of the 2 plants is drawn at its reported coordinates.

Loading map…
  • Nuclear · 2

List of nuclear power plants in Georgia

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

nuclear power plants in Georgia
VogtleNuclearGeorgia Power CoBurke4,65841987Operating
Edwin I HatchNuclearGeorgia Power CoAppling1,84821975Operating

Largest nuclear power plants in Georgia

  1. 1VogtleBurke County, Georgia4,658 MW
  2. 2Edwin I HatchAppling County, Georgia1,848 MW

Nuclear power plants by county in Georgia

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Burke14,658
Appling11,848

Nuclear Power Plants in Georgia: FAQ

How many nuclear power plants are in Georgia?
2, with 7 GW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
Is there a map of Georgia nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest nuclear power plant in Georgia?
Vogtle, at 5 GW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Georgia?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Georgia's nuclear power plants?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Georgia is largely a vertically integrated utility rather than an organised market.