Nuclear Power Plants in Florida
Every operating nuclear power plant in Florida as of 2026-07: 2 plants, 9 reactors and 5 GW of nameplate capacity across 2 counties.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 2
- 9 generating units
- Nameplate capacity
- 5 GW
- Counties
- 2
- Grid operator
- Mixed
- no single ISO covers a majority
Map of nuclear power plants in Florida
Every one of the 2 plants is drawn at its reported coordinates.
Loading map…
- Nuclear · 2
List of nuclear power plants in Florida
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Turkey Point2 technologies | Florida Power & Light Co | Miami Dade | 2,978.4 | 7 | 1972 | Operating |
|---|---|---|---|---|---|---|
| St LucieNuclear | Florida Power & Light Co | St Lucie | 2,160 | 2 | 1976 | Operating |
Largest nuclear power plants in Florida
- 1Turkey PointMiami Dade County, Florida2,978.4 MW
- 2St LucieSt Lucie County, Florida2,160 MW
Nuclear power plants by county in Florida
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Miami Dade | 1 | 2,978.4 |
| St Lucie | 1 | 2,160 |
Nuclear Power Plants in Florida: FAQ
- How many nuclear power plants are in Florida?
- 2, with 5 GW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
- Is there a map of Florida nuclear power plants?
- Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest nuclear power plant in Florida?
- Turkey Point, at 3 GW. The table is sorted largest first, so the rest follow it.
- Is there a nuclear power plant near me in Florida?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Florida's nuclear power plants?
- No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Florida is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.