Nuclear Power Plants in Texas
Every operating nuclear power plant in Texas as of 2026-07: 2 plants, 4 reactors and 5 GW of nameplate capacity across 2 counties, most of it inside ERCOT.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 2
- 4 generating units
- Nameplate capacity
- 5 GW
- Counties
- 2
- Grid operator
- ERCOT
- covers most of these plants
Map of nuclear power plants in Texas
Every one of the 2 plants is drawn at its reported coordinates.
Loading map…
- Nuclear · 2
List of nuclear power plants in Texas
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| South Texas ProjectNuclear | STP Nuclear Operating Co | Matagorda | 2,708.6 | 2 | 1988 | Operating |
|---|---|---|---|---|---|---|
| Comanche PeakNuclear | Luminant Generation Company LLC | Somervell | 2,430 | 2 | 1990 | Operating |
Largest nuclear power plants in Texas
- 1South Texas ProjectMatagorda County, Texas2,708.6 MW
- 2Comanche PeakSomervell County, Texas2,430 MW
Nuclear power plants by county in Texas
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Matagorda | 1 | 2,708.6 |
| Somervell | 1 | 2,430 |
Nuclear Power Plants in Texas: FAQ
- How many nuclear power plants are in Texas?
- 2, with 5 GW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
- Is there a map of Texas nuclear power plants?
- Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest nuclear power plant in Texas?
- South Texas Project, at 3 GW. The table is sorted largest first, so the rest follow it.
- Is there a nuclear power plant near me in Texas?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Texas's nuclear power plants?
- Most of them sit inside ERCOT, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.