Nuclear Power Plants in Mississippi

Every operating nuclear power plant in Mississippi as of 2026-07: 1 plants, 1 reactors and 1 GW of nameplate capacity across 1 county, most of it inside MISO.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
1 generating units
Nameplate capacity
1 GW
Counties
1
Grid operator
MISO
covers most of these plants

Map of nuclear power plants in Mississippi

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Nuclear · 1

List of nuclear power plants in Mississippi

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

nuclear power plants in Mississippi
Grand GulfNuclearSystem Energy Resources, IncClaiborne1,44011985Operating

Largest nuclear power plants in Mississippi

  1. 1Grand GulfClaiborne County, Mississippi1,440 MW

Nuclear power plants by county in Mississippi

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Claiborne11,440

Nuclear Power Plants in Mississippi: FAQ

How many nuclear power plants are in Mississippi?
1, with 1 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Mississippi nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest nuclear power plant in Mississippi?
Grand Gulf, at 1 GW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Mississippi?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Mississippi's nuclear power plants?
Most of them sit inside MISO, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.