Nuclear Power Plants in Missouri
Every operating nuclear power plant in Missouri as of 2026-07: 1 plants, 1 reactors and 1 GW of nameplate capacity across 1 county, most of it inside MISO.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 1 GW
- Counties
- 1
- Grid operator
- MISO
- covers most of these plants
Map of nuclear power plants in Missouri
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Nuclear · 1
List of nuclear power plants in Missouri
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| CallawayNuclear | Union Electric Co - (MO) | Callaway | 1,235.8 | 1 | 1984 | Operating |
|---|
Largest nuclear power plants in Missouri
- 1CallawayCallaway County, Missouri1,235.8 MW
Nuclear power plants by county in Missouri
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Callaway | 1 | 1,235.8 |
Nuclear Power Plants in Missouri: FAQ
- How many nuclear power plants are in Missouri?
- 1, with 1 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of Missouri nuclear power plants?
- Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest nuclear power plant in Missouri?
- Callaway, at 1 GW. The table is sorted largest first, so the rest follow it.
- Is there a nuclear power plant near me in Missouri?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Missouri's nuclear power plants?
- Most of them sit inside MISO, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.