Nuclear Power Plants in Tennessee

Every operating nuclear power plant in Tennessee as of 2026-07: 2 plants, 4 reactors and 5 GW of nameplate capacity across 2 counties.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
2
4 generating units
Nameplate capacity
5 GW
Counties
2
Grid operator
Mixed
no single ISO covers a majority

Map of nuclear power plants in Tennessee

Every one of the 2 plants is drawn at its reported coordinates.

Loading map…
  • Nuclear · 2

List of nuclear power plants in Tennessee

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

nuclear power plants in Tennessee
Watts Bar Nuclear PlantNuclearTennessee Valley AuthorityRhea2,539.821996Operating
SequoyahNuclearTennessee Valley AuthorityHamilton2,44121981Operating

Largest nuclear power plants in Tennessee

  1. 1Watts Bar Nuclear PlantRhea County, Tennessee2,539.8 MW
  2. 2SequoyahHamilton County, Tennessee2,441 MW

Nuclear power plants by county in Tennessee

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Rhea12,539.8
Hamilton12,441

Nuclear Power Plants in Tennessee: FAQ

How many nuclear power plants are in Tennessee?
2, with 5 GW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
Is there a map of Tennessee nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest nuclear power plant in Tennessee?
Watts Bar Nuclear Plant, at 3 GW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Tennessee?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Tennessee's nuclear power plants?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Tennessee is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Commercial electricity-generating nuclear reactors. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.