Nuclear Power Plants in Virginia

Every operating nuclear power plant in Virginia on EIA-860M for 2026-07: 2 plants, 5 reactors and 4 GW of nameplate capacity across 2 counties, most of it inside PJM.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
2
5 generating units
Nameplate capacity
4 GW
Counties
2
Grid operator
PJM
covers most of these plants

Map of nuclear power plants in Virginia

Every one of the 2 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Nuclear · 2

List of nuclear power plants in Virginia

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

nuclear power plants in Virginia
North Anna2 technologiesVirginia Electric & Power CoLouisa1,960.431978Operating
SurryNuclearVirginia Electric & Power CoSurry1,69521972Operating

Largest nuclear power plants in Virginia

  1. 1North AnnaLouisa County, Virginia1,960.4 MW
  2. 2SurrySurry County, Virginia1,695 MW

Nuclear power plants by county in Virginia

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Louisa11,960.4
Surry11,695

Nuclear Power Plants in Virginia: FAQ

How many nuclear power plants are in Virginia?
2, with 4 GW of nameplate capacity between them, spread over 2 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Virginia nuclear power plants?
Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest nuclear power plant in Virginia?
North Anna, at 2 GW. The table is sorted largest first, so the rest follow it.
Is there a nuclear power plant near me in Virginia?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Virginia's nuclear power plants?
Most of them sit inside PJM, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. EIA technology "Nuclear" — commercial reactors reporting on EIA-860M. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.