Nuclear Power Plants in Washington
Every operating nuclear power plant in Washington on EIA-860M for 2026-07: 1 plants, 1 reactors and 1 GW of nameplate capacity across 1 county.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 1 GW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of nuclear power plants in Washington
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Nuclear · 1
List of nuclear power plants in Washington
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Columbia Generating StationNuclear | Energy Northwest- Columbia | Benton | 1,200 | 1 | 1984 | Operating |
Largest nuclear power plants in Washington
- 1Columbia Generating StationBenton County, Washington1,200 MW
Nuclear power plants by county in Washington
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Benton | 1 | 1,200 |
Nuclear Power Plants in Washington: FAQ
- How many nuclear power plants are in Washington?
- 1, with 1 GW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Washington nuclear power plants?
- Yes — the map above. Each dot is one nuclear power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest nuclear power plant in Washington?
- Columbia Generating Station, at 1 GW. The table is sorted largest first, so the rest follow it.
- Is there a nuclear power plant near me in Washington?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Washington's nuclear power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Washington is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. EIA technology "Nuclear" — commercial reactors reporting on EIA-860M. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.