Hybrid-Electric Building Technologies West Los Angeles 1 power plants

Every generating plant EIA-860M files against Hybrid-Electric Building Technologies West Los Angeles 1 for 2026-07: 9 plants, 17 MW of nameplate capacity, across 1 state and 1 energy source.

EIA files this entity as “Hybrid-Electric Building Technologies West Los Angeles 1, LLC”.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
9
Nameplate capacity
17 MW
States
1
CA
Energy sources
1

Hybrid-Electric Building Technologies West Los Angeles 1 plants by energy source

  • Battery9 plants · 17 MW

Full list of Hybrid-Electric Building Technologies West Los Angeles 1 power plants

Power plants operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC
OCSDBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange4.912019Operating
CSU Long BeachBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCLos Angeles2.512017Operating
DowneyBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCLos Angeles212019Operating
AllerganBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange1.512019Operating
Long Beach Convention CenterBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCLos Angeles1.512019Operating
SOCCDBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange1.312019Operating
BakerBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange1.212019Operating
DATSBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange112017Operating
LAWRPBatteriesHybrid-Electric Building Technologies West Los Angeles 1, LLCOrange112019Operating

Hybrid-Electric Building Technologies West Los Angeles 1: FAQ

How many power plants does Hybrid-Electric Building Technologies West Los Angeles 1 operate?
EIA-860M lists 9 operating plants against “Hybrid-Electric Building Technologies West Los Angeles 1, LLC” for 2026-07, totalling 17 MW of nameplate capacity in 1 state.
Is Hybrid-Electric Building Technologies West Los Angeles 1 the owner of these plants?
EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
Why are affiliates listed separately?
Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.