Water Treatment 1 & 2

Water Treatment 1 & 2 is a 5 MW oil-fired power plant in New London County, Connecticut, operated by Connecticut Mun Elec Engy Coop. It has 2 generating units here, inside ISO New England. Its units entered service in 2010.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5.2 MW
5 MW net summer
Generating units
2
In service
2010
Plant code
57605

Where it is

Loading map…
County
New London County, Connecticut
Coordinates
41.3469, -72.0411
Balancing authority
ISNE
Sector
Electric Utility

Units, technology and status

Operator of record
Connecticut Mun Elec Engy Coop
Primary energy source
Petroleum
Technologies
Petroleum Liquids
Status
Operating

Every plant operated by Connecticut Mun Elec Engy Coop →

Water Treatment 1 & 2: FAQ

Where is Water Treatment 1 & 2?
In New London County, Connecticut (CT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Water Treatment 1 & 2?
5 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Water Treatment 1 & 2?
Connecticut Mun Elec Engy Coop is the operator of record. That is not always the ultimate owner.
Is this the same as Water Treatment 1 & 2 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Connecticut Mun Elec Engy Coop here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Water Treatment 1 & 2 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Water Treatment 1 & 2 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.