PPG Monroeville Chemicals Center

PPG Monroeville Chemicals Center is a 1 MW oil-fired power plant in Allegheny County, Pennsylvania, operated by PPG Monroeville Chemicals Center. EIA-860M lists 2 generating units here, inside PJM. Its units entered service between 1998 and 2000.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1.1 MW
1.1 MW net summer
Generating units
2
In service
1998–2000
EIA plant ID
58047

Where it is

Loading map…
County
Allegheny County, Pennsylvania
Coordinates
40.4422, -79.7311
Balancing authority
PJM
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
PPG Monroeville Chemicals Center
Primary energy source
Petroleum
Technologies
Petroleum Liquids
Status
Standby/Backup

Every plant PPG Monroeville Chemicals Center reports to EIA →

PPG Monroeville Chemicals Center: FAQ

Where is PPG Monroeville Chemicals Center?
In Allegheny County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is PPG Monroeville Chemicals Center?
1 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns PPG Monroeville Chemicals Center?
EIA-860M names PPG Monroeville Chemicals Center as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as PPG Monroeville Chemicals Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — PPG Monroeville Chemicals Center here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "PPG Monroeville Chemicals Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is PPG Monroeville Chemicals Center still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.