Vitro Architectural Glass (PA)

Vitro Architectural Glass (PA) is a 5 MW oil-fired power plant in Cumberland County, Pennsylvania, operated by Vitro Architectural Glass (PA). EIA-860M lists 3 generating units here, inside PJM. Its units entered service between 1996 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
3
In service
1996–2021
EIA plant ID
58051

Where it is

Loading map…
County
Cumberland County, Pennsylvania
Coordinates
40.1264, -77.1644
Balancing authority
PJM
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Vitro Architectural Glass (PA)
Primary energy source
Petroleum
Technologies
Petroleum Liquids
Status
Standby/Backup

Every plant Vitro Architectural Glass (PA) reports to EIA →

Vitro Architectural Glass (PA): FAQ

Where is Vitro Architectural Glass (PA)?
In Cumberland County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Vitro Architectural Glass (PA)?
5 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Vitro Architectural Glass (PA)?
EIA-860M names Vitro Architectural Glass (PA) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Vitro Architectural Glass (PA) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Vitro Architectural Glass (PA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Vitro Architectural Glass (PA) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Vitro Architectural Glass (PA) still running?
EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.