Vitro Architectural Glass (PA)
Vitro Architectural Glass (PA) is a 5 MW oil-fired power plant in Cumberland County, Pennsylvania, operated by Vitro Architectural Glass (PA). EIA-860M lists 3 generating units here, inside PJM. Its units entered service between 1996 and 2021.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 5 MW
- 5 MW net summer
- Generating units
- 3
- In service
- 1996–2021
- EIA plant ID
- 58051
Where it is
Loading map…
- County
- Cumberland County, Pennsylvania
- Coordinates
- 40.1264, -77.1644
- Balancing authority
- PJM
- Sector
- Industrial Non-CHP
Units, technology and status
- Operator of record
- Vitro Architectural Glass (PA)
- Primary energy source
- Petroleum
- Technologies
- Petroleum Liquids
- Status
- Standby/Backup
Vitro Architectural Glass (PA): FAQ
- Where is Vitro Architectural Glass (PA)?
- In Cumberland County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Vitro Architectural Glass (PA)?
- 5 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
- Who owns Vitro Architectural Glass (PA)?
- EIA-860M names Vitro Architectural Glass (PA) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Vitro Architectural Glass (PA) LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Vitro Architectural Glass (PA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Vitro Architectural Glass (PA) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Vitro Architectural Glass (PA) still running?
- EIA-860M files it as "Standby/Backup" for 2026-07. Statuses change monthly, and this page follows the monthly release.