What is planned in California as of 2026-07: 2 hydroelectric power plants totalling 8 MW, each with the in-service year its developer reported and its construction status. A planned project is not a built one.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Planned projects
- 2
- 2 generating units
- Proposed capacity
- 8 MW
- Earliest in-service year
- 2026
- Latest in-service year
- 2028
Map of planned hydroelectric power plants in California
Loading map…
List of planned hydroelectric power plants in California
| Rancho PenasquitosConventional Hydroelectric | San Diego County Water Auth | San Diego | 4.3 | 1 | 2026 | Under construction |
|---|---|---|---|---|---|---|
| Pine FlatConventional Hydroelectric | Kings River Conservation Dist | Fresno | 3.8 | 1 | 2028 | Regulatory approvals received. Not under construction |
Where they are in the build
- Under construction1
- Regulatory approvals received. Not under construction1
Planned hydroelectric power plants in California: FAQ
- How many hydroelectric power plants are planned in California?
- 2, for 8 MW of nameplate capacity. These are generators developers have reported as planned, not generators that exist.
- What do the status letters mean?
- Each planned generator carries a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
- Do these projects always get built?
- No. Projects are canceled or postponed, and move in and out of the planned list month to month. This page lists what was planned as of 2026-07 and nothing more.