Planned solar farms in Maryland
What EIA-860M's Planned sheet says is coming in Maryland: 9 solar farms totalling 71 MW, each with the in-service year its developer reported and the construction status EIA records. A planned project is not a built one.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Planned projects
- 9
- 9 generating units
- Proposed capacity
- 71 MW
- Earliest in-service year
- 2026
- Latest in-service year
- 2026
Map of planned solar farms in Maryland
Loading map…
List of planned solar farms in Maryland
| Morgnec SolarSolar Photovoltaic | Urban Grid Solar | Kent | 55.8 | 1 | 2026 | Under construction |
| NCBP ONE, LLCSolar Photovoltaic | Pivot Energy | Prince Georges | 2.5 | 1 | 2026 | Under construction |
| MDD109-NCBP BLDG 11-ManekinSolar Photovoltaic | Pivot Energy | Prince Georges | 2.4 | 1 | 2026 | Under construction |
| NCBP SevenSolar Photovoltaic | Pivot Energy | Prince Georges | 2.4 | 1 | 2026 | Under construction |
| City of BowieSolar Photovoltaic | Tesla Inc. | Prince Georges | 2 | 1 | 2026 | Under construction |
| 100a Swiss Dale FarmSolar Photovoltaic | Pivot Energy | Cecil | 2 | 1 | 2026 | Under construction |
| RoxburySolar Photovoltaic | Roxbury Road Solar 1 LLC | Howard | 1.5 | 1 | 2026 | Under construction |
| NCBP TEN, LLCSolar Photovoltaic | Pivot Energy | Prince Georges | 1.4 | 1 | 2026 | Under construction |
| NCBP TWELVE, LLCSolar Photovoltaic | Pivot Energy | Prince Georges | 1.2 | 1 | 2026 | Under construction |
Where they are in the build
- Under construction8
- Under construction1
Planned solar farms in Maryland: FAQ
- How many solar farms are planned in Maryland?
- 9, for 71 MW of nameplate capacity. These are generators developers have reported to EIA, not generators that exist.
- What do the status letters mean?
- EIA files each planned generator under a status: regulatory approvals pending, under construction at or below half complete, under construction more than half complete, construction complete but not yet in commercial operation, or planned but not yet started. Each row shows its own.
- Do these projects always get built?
- No. EIA keeps a separate Canceled or Postponed sheet, and projects move between the sheets month to month. This page is the Planned sheet for 2026-07 and nothing more.