Agua Caliente Solar Project

Agua Caliente Solar Project is a 348 MW solar farm in Yuma County, Arizona, operated by Agua Caliente Solar. It has 3 generating units here, inside CAISO. Its units entered service between 2012 and 2014.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
347.7 MW
347.7 MW net summer
Generating units
3
In service
2012–2014
Plant code
57373

Where it is

Loading map…
County
Yuma County, Arizona
Coordinates
32.9774, -113.4945
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Agua Caliente Solar
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Agua Caliente Solar Project: FAQ

Where is Agua Caliente Solar Project?
In Yuma County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Agua Caliente Solar Project?
348 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Agua Caliente Solar Project?
Agua Caliente Solar is the operator of record. That is not always the ultimate owner.
Is this the same as Agua Caliente Solar Project LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Agua Caliente Solar here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Agua Caliente Solar Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Agua Caliente Solar Project still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.