Hyder Solar Hybrid
Hyder Solar Hybrid is a 48 MW solar farm in Yuma County, Arizona, operated by Arizona Public Service Co. It has 3 generating units here. Its units entered service between 2011 and 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 48 MW
- 47 MW net summer
- Generating units
- 3
- In service
- 2011–2023
- Plant code
- 57563
Where it is
Loading map…
- County
- Yuma County, Arizona
- Coordinates
- 33.0257, -113.344
- Balancing authority
- AZPS
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Arizona Public Service Co
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 32 MW, Battery 16 MW. It is listed here under Solar, the energy source with the most capacity.
Hyder Solar Hybrid: FAQ
- Where is Hyder Solar Hybrid?
- In Yuma County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Hyder Solar Hybrid?
- 48 MW of nameplate capacity across 3 units, as of 2026-07.
- Who owns Hyder Solar Hybrid?
- Arizona Public Service Co is the operator of record. That is not always the ultimate owner.
- Is this the same as Hyder Solar Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Arizona Public Service Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hyder Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Hyder Solar Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.