Red Horse 2

Red Horse 2 is a 81 MW solar farm in Cochise County, Arizona, operated by Red Horse 2. EIA-860M lists 2 generating units here. Its units entered service in 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
81 MW
81 MW net summer
Generating units
2
In service
2015
EIA plant ID
58833

Where it is

Loading map…
County
Cochise County, Arizona
Coordinates
32.2861, -110.0881
Balancing authority
TEPC
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Red Horse 2
Primary energy source
Solar
Technologies
Onshore Wind Turbine, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 51 MW, Wind 30 MW. It is filed here under Solar, the source with the most capacity.

Every plant Red Horse 2 reports to EIA →

Red Horse 2: FAQ

Where is Red Horse 2?
In Cochise County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Red Horse 2?
81 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Red Horse 2?
EIA-860M names Red Horse 2 as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Red Horse 2 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Red Horse 2 here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Red Horse 2 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Red Horse 2 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.