Fort Huachuca Solar PV Project
Fort Huachuca Solar PV Project is a 18 MW solar farm in Cochise County, Arizona, operated by Tucson Electric Power Co. It has 2 generating units here. Its units entered service between 2014 and 2017.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 17.7 MW
- 18 MW net summer
- Generating units
- 2
- In service
- 2014–2017
- Plant code
- 58972
Where it is
Loading map…
- County
- Cochise County, Arizona
- Coordinates
- 31.5553, -110.35
- Balancing authority
- TEPC
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- Tucson Electric Power Co
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Fort Huachuca Solar PV Project: FAQ
- Where is Fort Huachuca Solar PV Project?
- In Cochise County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Fort Huachuca Solar PV Project?
- 18 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Fort Huachuca Solar PV Project?
- Tucson Electric Power Co is the operator of record. That is not always the ultimate owner.
- Is this the same as Fort Huachuca Solar PV Project LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Tucson Electric Power Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Fort Huachuca Solar PV Project LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Fort Huachuca Solar PV Project still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.