Red Horse III
Red Horse III is a 30 MW solar farm in Cochise County, Arizona, operated by Red Horse III. EIA-860M lists 1 generating unit here. Its unit entered service in 2016.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 30 MW
- 30 MW net summer
- Generating units
- 1
- In service
- 2016
- EIA plant ID
- 60285
Where it is
Loading map…
- County
- Cochise County, Arizona
- Coordinates
- 32.136, -110.0513
- Balancing authority
- TEPC
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Red Horse III
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Red Horse III: FAQ
- Where is Red Horse III?
- In Cochise County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Red Horse III?
- 30 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
- Who owns Red Horse III?
- EIA-860M names Red Horse III as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Red Horse III LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Red Horse III here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Red Horse III LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Red Horse III still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.