Pinal Central Energy Center Hybrid

Pinal Central Energy Center Hybrid is a 30 MW solar farm in Pinal County, Arizona, operated by Pinal Central Energy Center, LLC. It has 2 generating units here. Its units entered service in 2018.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
30 MW
30 MW net summer
Generating units
2
In service
2018
Plant code
61678

Where it is

Loading map…
County
Pinal County, Arizona
Coordinates
32.8757, -111.5511
Balancing authority
SRP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Pinal Central Energy Center, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 20 MW, Battery 10 MW. It is listed here under Solar, the energy source with the most capacity.

Pinal Central Energy Center Hybrid: FAQ

Where is Pinal Central Energy Center Hybrid?
In Pinal County, Arizona (AZ). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Pinal Central Energy Center Hybrid?
30 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Pinal Central Energy Center Hybrid?
Pinal Central Energy Center, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Pinal Central Energy Center Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Pinal Central Energy Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pinal Central Energy Center Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Pinal Central Energy Center Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.