Pinal Central Energy Center Hybrid

Pinal Central Energy Center Hybrid is a 30 MW solar farm in Pinal County, Arizona, operated by Pinal Central Energy Center, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
30 MW
30 MW net summer
Generating units
2
In service
2018
EIA plant ID
61678

Where it is

Loading map…
County
Pinal County, Arizona
Coordinates
32.8757, -111.5511
Balancing authority
SRP
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Pinal Central Energy Center, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 20 MW, Battery 10 MW. It is filed here under Solar, the source with the most capacity.

Every plant Pinal Central Energy Center, LLC reports to EIA →

Pinal Central Energy Center Hybrid: FAQ

Where is Pinal Central Energy Center Hybrid?
In Pinal County, Arizona (AZ). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Pinal Central Energy Center Hybrid?
30 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Pinal Central Energy Center Hybrid?
EIA-860M names Pinal Central Energy Center, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Pinal Central Energy Center Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Pinal Central Energy Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Pinal Central Energy Center Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Pinal Central Energy Center Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.