Thunder Wolf Energy Center Hybrid

Thunder Wolf Energy Center Hybrid is a 348 MW solar farm in Pueblo County, Colorado, operated by Thunder Wolf Energy Center, LLC. EIA-860M lists 2 generating units here. Its units entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
348 MW
348 MW net summer
Generating units
2
In service
2023
EIA plant ID
63776

Where it is

Loading map…
County
Pueblo County, Colorado
Coordinates
38.1899, -104.398
Balancing authority
PSCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Thunder Wolf Energy Center, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 248 MW, Battery 100 MW. It is filed here under Solar, the source with the most capacity.

Every plant Thunder Wolf Energy Center, LLC reports to EIA →

Thunder Wolf Energy Center Hybrid: FAQ

Where is Thunder Wolf Energy Center Hybrid?
In Pueblo County, Colorado (CO). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Thunder Wolf Energy Center Hybrid?
348 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Thunder Wolf Energy Center Hybrid?
EIA-860M names Thunder Wolf Energy Center, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Thunder Wolf Energy Center Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Thunder Wolf Energy Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Thunder Wolf Energy Center Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Thunder Wolf Energy Center Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.