Perdue Bridgeville Photovoltaic

Perdue Bridgeville Photovoltaic is a 1 MW solar farm in Sussex County, Delaware, operated by Terraform Arcadia. It has 1 generating unit here, inside PJM. Its unit entered service in 2011.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.3 MW
1.3 MW net summer
Generating units
1
In service
2011
Plant code
57772

Where it is

Loading map…
County
Sussex County, Delaware
Coordinates
38.7577, -75.602
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Terraform Arcadia
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Terraform Arcadia →

Perdue Bridgeville Photovoltaic: FAQ

Where is Perdue Bridgeville Photovoltaic?
In Sussex County, Delaware (DE). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Perdue Bridgeville Photovoltaic?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Perdue Bridgeville Photovoltaic?
Terraform Arcadia is the operator of record. That is not always the ultimate owner.
Is this the same as Perdue Bridgeville Photovoltaic LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Terraform Arcadia here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Perdue Bridgeville Photovoltaic LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Perdue Bridgeville Photovoltaic still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.