Echo River Solar

Echo River Solar is a 105 MW solar farm in Suwannee County, Florida, operated by Florida Power & Light Co. EIA-860M lists 2 generating units here. Its units entered service between 2020 and 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
104.5 MW
104.5 MW net summer
Generating units
2
In service
2020–2021
EIA plant ID
62490

Where it is

Loading map…
County
Suwannee County, Florida
Coordinates
30.2962, -82.8643
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 75 MW, Battery 30 MW. It is filed here under Solar, the source with the most capacity.

Every plant Florida Power & Light Co reports to EIA →

Echo River Solar: FAQ

Where is Echo River Solar?
In Suwannee County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Echo River Solar?
105 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Echo River Solar?
EIA-860M names Florida Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Echo River Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Echo River Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Echo River Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.