IL - ForeFront CS (BBCHS 1) Community Solar

IL - ForeFront CS (BBCHS 1) Community Solar is a 5 MW solar farm in Kankakee County, Illinois, operated by IL Solar Bradley Project1, LLC. EIA-860M lists 1 generating unit here, inside PJM. Its unit entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2026
EIA plant ID
70014

Where it is

Loading map…
County
Kankakee County, Illinois
Coordinates
41.1788, -87.8065
Balancing authority
PJM
Sector
IPP Non-CHP

Units, technology and status

Operator of record
IL Solar Bradley Project1, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant IL Solar Bradley Project1, LLC reports to EIA →

IL - ForeFront CS (BBCHS 1) Community Solar: FAQ

Where is IL - ForeFront CS (BBCHS 1) Community Solar?
In Kankakee County, Illinois (IL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is IL - ForeFront CS (BBCHS 1) Community Solar?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns IL - ForeFront CS (BBCHS 1) Community Solar?
EIA-860M names IL Solar Bradley Project1, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as IL - ForeFront CS (BBCHS 1) Community Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — IL Solar Bradley Project1, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "IL - ForeFront CS (BBCHS 1) Community Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is IL - ForeFront CS (BBCHS 1) Community Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.