Unbridled Solar

Unbridled Solar is a 160 MW solar farm in Henderson County, Kentucky, operated by Geronimo Power. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
160 MW
160 MW net summer
Generating units
1
In service
2025
EIA plant ID
67165

Where it is

Loading map…
County
Henderson County, Kentucky
Coordinates
37.652, -87.552
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Geronimo Power
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Geronimo Power reports to EIA →

Unbridled Solar: FAQ

Where is Unbridled Solar?
In Henderson County, Kentucky (KY). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Unbridled Solar?
160 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Unbridled Solar?
EIA-860M names Geronimo Power as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Unbridled Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Geronimo Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Unbridled Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Unbridled Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.