Solar Farms in Kentucky

Every operating solar farm in Kentucky on EIA-860M for 2026-07: 19 plants, 19 generating units and 1 GW of nameplate capacity across 14 counties, most of it inside PJM.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
19
19 generating units
Nameplate capacity
1 GW
Counties
14
Grid operator
PJM
covers most of these plants

Map of solar farms in Kentucky

Every one of the 19 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Solar · 19

List of solar farms in Kentucky

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

solar farms in Kentucky
Sebree Solar, LLCSolar PhotovoltaicSebree Solar, LLCHenderson25012025Operating
Green River SolarSolar PhotovoltaicGreen River Solar, LLCMeade20012025Operating
SR RussellvilleSolar PhotovoltaicSR Russellville, LLCLogan17312024Operating
Unbridled SolarSolar PhotovoltaicGeronimo PowerHenderson16012025Operating
Martin County Solar Project, LLCSolar PhotovoltaicMartin County Solar Project, LLCMartin11112024Operating
Bluebird Solar LLCSolar PhotovoltaicMN8 Energy LLCHarrison10012025Operating
Ashwood Solar ISolar PhotovoltaicRWE Clean EnergyLyon8612026Operating
Glover Creek Solar, LLCSolar PhotovoltaicGlover Creek Solar, LLCMetcalfe5512024Operating
SR Turkey Creek, LLCSolar PhotovoltaicSR Turkey Creek, LLCGarrard5012022Operating
Cooperative Solar OneSolar PhotovoltaicEast Kentucky Power Coop, IncClark8.512017Operating
SR Warren, LLCSolar PhotovoltaicSR Warren, LLCSimpson3.512024Operating
Crittenden Solar FacilitySolar PhotovoltaicDuke Energy Kentucky IncGrant2.712017Operating
SR Franklin, LLCSolar PhotovoltaicSR Franklin, LLCSimpson2.512023Operating
LGE-KU Solar Share Facility SimpsonvilleSolar PhotovoltaicKentucky Utilities CoShelby2.112019Operating
Walton 1 Solar FacilitySolar PhotovoltaicDuke Energy Kentucky IncKenton212017Operating
Walton 2 Solar FacilitySolar PhotovoltaicDuke Energy Kentucky IncKenton212017Operating
Aero Solar FacilitySolar PhotovoltaicDuke Energy Kentucky IncBoone212023Operating
RA Jones Roof Mounted Solar SystemSolar PhotovoltaicRA JonesKenton1.312024Operating
L'Oreal Solar - FlorenceSolar PhotovoltaicL'Oreal USA Products IncBoone1.112017Operating

Largest solar farms in Kentucky

  1. 1Sebree Solar, LLCHenderson County, Kentucky250 MW
  2. 2Green River SolarMeade County, Kentucky200 MW
  3. 3SR RussellvilleLogan County, Kentucky173 MW
  4. 4Unbridled SolarHenderson County, Kentucky160 MW
  5. 5Martin County Solar Project, LLCMartin County, Kentucky111 MW
  6. 6Bluebird Solar LLCHarrison County, Kentucky100 MW
  7. 7Ashwood Solar ILyon County, Kentucky86 MW
  8. 8Glover Creek Solar, LLCMetcalfe County, Kentucky55 MW
  9. 9SR Turkey Creek, LLCGarrard County, Kentucky50 MW
  10. 10Cooperative Solar OneClark County, Kentucky8.5 MW

Solar farms by county in Kentucky

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Henderson2410
Meade1200
Logan1173
Martin1111
Harrison1100
Lyon186
Metcalfe155
Garrard150
Clark18.5
Simpson26
Kenton35.3
Boone23.1
Grant12.7
Shelby12.1

Solar Farms in Kentucky: FAQ

How many solar farms are in Kentucky?
19, with 1 GW of nameplate capacity between them, spread over 14 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Kentucky solar farms?
Yes — the map above. Each dot is one solar farm, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest solar farm in Kentucky?
Sebree Solar, LLC, at 250 MW. The table is sorted largest first, so the rest follow it.
Is there a solar farm near me in Kentucky?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Kentucky's solar farms?
Most of them sit inside PJM, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Solar photovoltaic and solar thermal, with and without storage. Utility-scale only: EIA-860M starts at 1 MW, so rooftop solar is not here. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.