ME Novel Lighthouse - Huggard Ave Solar

ME Novel Lighthouse - Huggard Ave Solar is a 3 MW solar farm in Aroostook County, Maine, operated by Luminace Sunbeam Development Holdings, LLC. EIA-860M lists 1 generating unit here. Its unit entered service in 2024.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.5 MW
2.5 MW net summer
Generating units
1
In service
2024
EIA plant ID
66833

Where it is

Loading map…
County
Aroostook County, Maine
Coordinates
46.9097, -67.8383
Balancing authority
NA
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Luminace Sunbeam Development Holdings, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Luminace Sunbeam Development Holdings, LLC reports to EIA →

ME Novel Lighthouse - Huggard Ave Solar: FAQ

Where is ME Novel Lighthouse - Huggard Ave Solar?
In Aroostook County, Maine (ME). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is ME Novel Lighthouse - Huggard Ave Solar?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns ME Novel Lighthouse - Huggard Ave Solar?
EIA-860M names Luminace Sunbeam Development Holdings, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as ME Novel Lighthouse - Huggard Ave Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Luminace Sunbeam Development Holdings, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "ME Novel Lighthouse - Huggard Ave Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is ME Novel Lighthouse - Huggard Ave Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.