Stetson Road Solar - Barre I

Stetson Road Solar - Barre I is a 2 MW solar farm in Worcester County, Massachusetts, operated by Kearsarge Solar LLC. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2014.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2 MW
2 MW net summer
Generating units
1
In service
2014
Plant code
59765

Where it is

Loading map…
County
Worcester County, Massachusetts
Coordinates
42.4029, -72.1027
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Kearsarge Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Kearsarge Solar LLC →

Stetson Road Solar - Barre I: FAQ

Where is Stetson Road Solar - Barre I?
In Worcester County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Stetson Road Solar - Barre I?
2 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Stetson Road Solar - Barre I?
Kearsarge Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Stetson Road Solar - Barre I LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Kearsarge Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Stetson Road Solar - Barre I LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Stetson Road Solar - Barre I still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.