Town of Foxborough - Landfill (SREC II)

Town of Foxborough - Landfill (SREC II) is a 1 MW solar farm in Norfolk County, Massachusetts, operated by Town of Foxborough - Landfill (SREC II). It has 1 generating unit here, inside ISO New England. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
1.2 MW
1.2 MW net summer
Generating units
1
In service
2017
Plant code
61591

Where it is

Loading map…
County
Norfolk County, Massachusetts
Coordinates
42.0597, -71.1354
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Town of Foxborough - Landfill (SREC II)
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Town of Foxborough - Landfill (SREC II): FAQ

Where is Town of Foxborough - Landfill (SREC II)?
In Norfolk County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Town of Foxborough - Landfill (SREC II)?
1 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Town of Foxborough - Landfill (SREC II)?
Town of Foxborough - Landfill (SREC II) is the operator of record. That is not always the ultimate owner.
Is this the same as Town of Foxborough - Landfill (SREC II) LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Town of Foxborough - Landfill (SREC II) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Town of Foxborough - Landfill (SREC II) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Town of Foxborough - Landfill (SREC II) still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.