Palmer

Palmer is a 4 MW solar farm in Hampden County, Massachusetts, operated by AES Distributed Energy. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3.5 MW
3.5 MW net summer
Generating units
1
In service
2019
Plant code
62135

Where it is

Loading map…
County
Hampden County, Massachusetts
Coordinates
42.2038, -72.3254
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by AES Distributed Energy →

Palmer: FAQ

Where is Palmer?
In Hampden County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Palmer?
4 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Palmer?
AES Distributed Energy is the operator of record. That is not always the ultimate owner.
Is this the same as Palmer LLC?
Probably, but the plant data does not say. It records a plant name and an operator — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Palmer LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Palmer still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.