GSPP Boxborough Littleton (MA)
GSPP Boxborough Littleton (MA) is a 4 MW solar farm in Middlesex County, Massachusetts, operated by CleanCapital Holdings. It has 1 generating unit here, inside ISO New England. Its unit entered service in 2019.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 4 MW
- 4 MW net summer
- Generating units
- 1
- In service
- 2019
- Plant code
- 62890
Where it is
Loading map…
- County
- Middlesex County, Massachusetts
- Coordinates
- 42.4856, -71.5409
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- CleanCapital Holdings
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
GSPP Boxborough Littleton (MA): FAQ
- Where is GSPP Boxborough Littleton (MA)?
- In Middlesex County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is GSPP Boxborough Littleton (MA)?
- 4 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns GSPP Boxborough Littleton (MA)?
- CleanCapital Holdings is the operator of record. That is not always the ultimate owner.
- Is this the same as GSPP Boxborough Littleton (MA) LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — CleanCapital Holdings here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "GSPP Boxborough Littleton (MA) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is GSPP Boxborough Littleton (MA) still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.