Syncarpha Puddon II Hybrid CSG

Syncarpha Puddon II Hybrid CSG is a 9 MW solar farm in Worcester County, Massachusetts, operated by Syncarpha Puddon II, LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
9 MW
9 MW net summer
Generating units
2
In service
2021
Plant code
62970

Where it is

Loading map…
County
Worcester County, Massachusetts
Coordinates
42.1339, -71.631
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Syncarpha Puddon II, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 5 MW, Battery 4 MW. It is listed here under Solar, the energy source with the most capacity.

Syncarpha Puddon II Hybrid CSG: FAQ

Where is Syncarpha Puddon II Hybrid CSG?
In Worcester County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Syncarpha Puddon II Hybrid CSG?
9 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Syncarpha Puddon II Hybrid CSG?
Syncarpha Puddon II, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Syncarpha Puddon II Hybrid CSG LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Syncarpha Puddon II, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Syncarpha Puddon II Hybrid CSG LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Syncarpha Puddon II Hybrid CSG still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.