CES Agawam Tuckahoe Solar Hybrid

CES Agawam Tuckahoe Solar Hybrid is a 6 MW solar farm in Hampden County, Massachusetts, operated by CES Agawam Tuckahoe Solar LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
6.2 MW
6.2 MW net summer
Generating units
2
In service
2021
Plant code
63763

Where it is

Loading map…
County
Hampden County, Massachusetts
Coordinates
42.059, -72.691
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
CES Agawam Tuckahoe Solar LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 4 MW, Battery 3 MW. It is listed here under Solar, the energy source with the most capacity.

CES Agawam Tuckahoe Solar Hybrid: FAQ

Where is CES Agawam Tuckahoe Solar Hybrid?
In Hampden County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is CES Agawam Tuckahoe Solar Hybrid?
6 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns CES Agawam Tuckahoe Solar Hybrid?
CES Agawam Tuckahoe Solar LLC is the operator of record. That is not always the ultimate owner.
Is this the same as CES Agawam Tuckahoe Solar Hybrid LLC?
Probably, but the plant data does not say. It records a plant name and an operator — CES Agawam Tuckahoe Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CES Agawam Tuckahoe Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is CES Agawam Tuckahoe Solar Hybrid still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.