CES Agawam Tuckahoe Solar Hybrid
CES Agawam Tuckahoe Solar Hybrid is a 6 MW solar farm in Hampden County, Massachusetts, operated by CES Agawam Tuckahoe Solar LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2021.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 6.2 MW
- 6.2 MW net summer
- Generating units
- 2
- In service
- 2021
- Plant code
- 63763
Where it is
Loading map…
- County
- Hampden County, Massachusetts
- Coordinates
- 42.059, -72.691
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- CES Agawam Tuckahoe Solar LLC
- Primary energy source
- Solar
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Solar 4 MW, Battery 3 MW. It is listed here under Solar, the energy source with the most capacity.
CES Agawam Tuckahoe Solar Hybrid: FAQ
- Where is CES Agawam Tuckahoe Solar Hybrid?
- In Hampden County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is CES Agawam Tuckahoe Solar Hybrid?
- 6 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns CES Agawam Tuckahoe Solar Hybrid?
- CES Agawam Tuckahoe Solar LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as CES Agawam Tuckahoe Solar Hybrid LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — CES Agawam Tuckahoe Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CES Agawam Tuckahoe Solar Hybrid LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is CES Agawam Tuckahoe Solar Hybrid still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.