Partridgeville Hybrid CSG

Partridgeville Hybrid CSG is a 5 MW solar farm in Worcester County, Massachusetts, operated by Partridgeville Road Solar 1, LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2020.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5.3 MW
5.3 MW net summer
Generating units
2
In service
2020
Plant code
63804

Where it is

Loading map…
County
Worcester County, Massachusetts
Coordinates
42.5714, -72.2574
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Partridgeville Road Solar 1, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 3 MW, Battery 2 MW. It is listed here under Solar, the energy source with the most capacity.

Partridgeville Hybrid CSG: FAQ

Where is Partridgeville Hybrid CSG?
In Worcester County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Partridgeville Hybrid CSG?
5 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Partridgeville Hybrid CSG?
Partridgeville Road Solar 1, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Partridgeville Hybrid CSG LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Partridgeville Road Solar 1, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Partridgeville Hybrid CSG LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Partridgeville Hybrid CSG still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.