West Haydenville PJ Community Solar

West Haydenville PJ Community Solar is a 9 MW solar farm in Hampshire County, Massachusetts, operated by AES Distributed Energy. EIA-860M lists 2 generating units here, inside ISO New England. Its units entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
8.6 MW
8.6 MW net summer
Generating units
2
In service
2022
EIA plant ID
64726

Where it is

Loading map…
County
Hampshire County, Massachusetts
Coordinates
42.3831, -72.7111
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Distributed Energy
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 5 MW, Battery 4 MW. It is filed here under Solar, the source with the most capacity.

Every plant AES Distributed Energy reports to EIA →

West Haydenville PJ Community Solar: FAQ

Where is West Haydenville PJ Community Solar?
In Hampshire County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is West Haydenville PJ Community Solar?
9 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns West Haydenville PJ Community Solar?
EIA-860M names AES Distributed Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as West Haydenville PJ Community Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AES Distributed Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "West Haydenville PJ Community Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is West Haydenville PJ Community Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.