160 Tihonet Rd Hybrid(CSG)

160 Tihonet Rd Hybrid(CSG) is a 8 MW solar farm in Plymouth County, Massachusetts, operated by 160TIH WHAM8 Solar, LLC. EIA-860M lists 2 generating units here, inside ISO New England. Its units entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
8.3 MW
8.3 MW net summer
Generating units
2
In service
2021
EIA plant ID
65056

Where it is

Loading map…
County
Plymouth County, Massachusetts
Coordinates
41.7934, -70.7127
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
160TIH WHAM8 Solar, LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Solar 5 MW, Battery 3 MW. It is filed here under Solar, the source with the most capacity.

Every plant 160TIH WHAM8 Solar, LLC reports to EIA →

160 Tihonet Rd Hybrid(CSG): FAQ

Where is 160 Tihonet Rd Hybrid(CSG)?
In Plymouth County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is 160 Tihonet Rd Hybrid(CSG)?
8 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns 160 Tihonet Rd Hybrid(CSG)?
EIA-860M names 160TIH WHAM8 Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as 160 Tihonet Rd Hybrid(CSG) LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — 160TIH WHAM8 Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "160 Tihonet Rd Hybrid(CSG) LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is 160 Tihonet Rd Hybrid(CSG) still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.