5 Berry

5 Berry is a 7 MW solar farm in Norfolk County, Massachusetts, operated by Madison Energy Investments LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
7.1 MW
7.1 MW net summer
Generating units
2
In service
2023
Plant code
67242

Where it is

Loading map…
County
Norfolk County, Massachusetts
Coordinates
42.021, -71.342
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Madison Energy Investments LLC
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 4 MW, Battery 3 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Madison Energy Investments LLC →

5 Berry: FAQ

Where is 5 Berry?
In Norfolk County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is 5 Berry?
7 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns 5 Berry?
Madison Energy Investments LLC is the operator of record. That is not always the ultimate owner.
Is this the same as 5 Berry LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Madison Energy Investments LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "5 Berry LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is 5 Berry still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.