Upland

Upland is a 7 MW solar farm in Plymouth County, Massachusetts, operated by Greenbacker Renewable Energy Corporation. It has 2 generating units here, inside ISO New England. Its units entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
7.3 MW
7.3 MW net summer
Generating units
2
In service
2025
Plant code
67276

Where it is

Loading map…
County
Plymouth County, Massachusetts
Coordinates
41.9641, -70.7888
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Greenbacker Renewable Energy Corporation
Primary energy source
Solar
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Solar 5 MW, Battery 2 MW. It is listed here under Solar, the energy source with the most capacity.

Every plant operated by Greenbacker Renewable Energy Corporation →

Upland: FAQ

Where is Upland?
In Plymouth County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Upland?
7 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns Upland?
Greenbacker Renewable Energy Corporation is the operator of record. That is not always the ultimate owner.
Is this the same as Upland LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Greenbacker Renewable Energy Corporation here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Upland LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Upland still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.