Tolland

Tolland is a 5 MW solar farm in Hampden County, Massachusetts, operated by Sunrise on Clubhouse Rd. LLC. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2020
EIA plant ID
68656

Where it is

Loading map…
County
Hampden County, Massachusetts
Coordinates
42.0872, -73.0116
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Sunrise on Clubhouse Rd. LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Sunrise on Clubhouse Rd. LLC reports to EIA →

Tolland: FAQ

Where is Tolland?
In Hampden County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Tolland?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Tolland?
EIA-860M names Sunrise on Clubhouse Rd. LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Tolland LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sunrise on Clubhouse Rd. LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tolland LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Tolland still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.