TCLP Solar Phase 1

TCLP Solar Phase 1 is a 1 MW solar farm in Leelanau County, Michigan, operated by Heritage Sustainable Energy. LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
1
In service
2017
EIA plant ID
63020

Where it is

Loading map…
County
Leelanau County, Michigan
Coordinates
44.7767, -85.6923
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Heritage Sustainable Energy. LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Heritage Sustainable Energy. LLC reports to EIA →

TCLP Solar Phase 1: FAQ

Where is TCLP Solar Phase 1?
In Leelanau County, Michigan (MI). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is TCLP Solar Phase 1?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns TCLP Solar Phase 1?
EIA-860M names Heritage Sustainable Energy. LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as TCLP Solar Phase 1 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Heritage Sustainable Energy. LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TCLP Solar Phase 1 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is TCLP Solar Phase 1 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.