Cement City Solar, LLC
Cement City Solar, LLC is a 20 MW solar farm in Lenawee County, Michigan, operated by AES Distributed Energy. It has 1 generating unit here, inside MISO. Its unit entered service in 2023.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 20 MW
- 20 MW net summer
- Generating units
- 1
- In service
- 2023
- Plant code
- 64567
Where it is
Loading map…
- County
- Lenawee County, Michigan
- Coordinates
- 42.0845, -84.1353
- Balancing authority
- MISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- AES Distributed Energy
- Primary energy source
- Solar
- Technologies
- Solar Photovoltaic
- Status
- Operating
Cement City Solar, LLC: FAQ
- Where is Cement City Solar, LLC?
- In Lenawee County, Michigan (MI). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Cement City Solar, LLC?
- 20 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns Cement City Solar, LLC?
- AES Distributed Energy is the operator of record. That is not always the ultimate owner.
- Is Cement City Solar, LLC still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.