Kramer Solar CSG

Kramer Solar CSG is a 3 MW solar farm in Renville County, Minnesota, operated by Geronimo Power. It has 3 generating units here, inside MISO. Its units entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
3 MW
3 MW net summer
Generating units
3
In service
2017
Plant code
61058

Where it is

Loading map…
County
Renville County, Minnesota
Coordinates
44.747, -94.7057
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Geronimo Power
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Geronimo Power →

Kramer Solar CSG: FAQ

Where is Kramer Solar CSG?
In Renville County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Kramer Solar CSG?
3 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Kramer Solar CSG?
Geronimo Power is the operator of record. That is not always the ultimate owner.
Is this the same as Kramer Solar CSG LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Geronimo Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Kramer Solar CSG LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Kramer Solar CSG still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.