Lemond Solar

Lemond Solar is a 5 MW solar farm in Steele County, Minnesota, operated by Adapture Renewables, Inc.. It has 1 generating unit here, inside MISO. Its unit entered service in 2017.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
5 MW
5 MW net summer
Generating units
1
In service
2017
Plant code
61072

Where it is

Loading map…
County
Steele County, Minnesota
Coordinates
44.081, -93.2859
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Adapture Renewables, Inc.
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant operated by Adapture Renewables, Inc. →

Lemond Solar: FAQ

Where is Lemond Solar?
In Steele County, Minnesota (MN). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Lemond Solar?
5 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Lemond Solar?
Adapture Renewables, Inc. is the operator of record. That is not always the ultimate owner.
Is this the same as Lemond Solar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Adapture Renewables, Inc. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Lemond Solar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Lemond Solar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.