St. Cloud Solar CSG

St. Cloud Solar CSG is a 5 MW solar farm in Stearns County, Minnesota, operated by Geronimo Power. EIA-860M lists 5 generating units here, inside MISO. Its units entered service in 2018.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
5
In service
2018
EIA plant ID
61384

Where it is

Loading map…
County
Stearns County, Minnesota
Coordinates
45.4774, -94.1213
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Geronimo Power
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Geronimo Power reports to EIA →

St. Cloud Solar CSG: FAQ

Where is St. Cloud Solar CSG?
In Stearns County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is St. Cloud Solar CSG?
5 MW of nameplate capacity across 5 units, as of the EIA-860M release for 2026-07.
Who owns St. Cloud Solar CSG?
EIA-860M names Geronimo Power as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as St. Cloud Solar CSG LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Geronimo Power here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "St. Cloud Solar CSG LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is St. Cloud Solar CSG still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.