CGSun, LLC Community Solar

CGSun, LLC Community Solar is a 4 MW solar farm in Washington County, Minnesota, operated by SunStrong Management, LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2017.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4 MW
4 MW net summer
Generating units
1
In service
2017
EIA plant ID
61545

Where it is

Loading map…
County
Washington County, Minnesota
Coordinates
44.8479, -92.875
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SunStrong Management, LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant SunStrong Management, LLC reports to EIA →

CGSun, LLC Community Solar: FAQ

Where is CGSun, LLC Community Solar?
In Washington County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is CGSun, LLC Community Solar?
4 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns CGSun, LLC Community Solar?
EIA-860M names SunStrong Management, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as CGSun, LLC Community Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — SunStrong Management, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "CGSun, LLC Community Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is CGSun, LLC Community Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.