Felton CSG PV1-5

Felton CSG PV1-5 is a 5 MW solar farm in Dakota County, Minnesota, operated by Ecoplexus, Inc. EIA-860M lists 5 generating units here, inside MISO. Its units entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5 MW
5 MW net summer
Generating units
5
In service
2019
EIA plant ID
62210

Where it is

Loading map…
County
Dakota County, Minnesota
Coordinates
44.5417, -92.9736
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Ecoplexus, Inc
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant Ecoplexus, Inc reports to EIA →

Felton CSG PV1-5: FAQ

Where is Felton CSG PV1-5?
In Dakota County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Felton CSG PV1-5?
5 MW of nameplate capacity across 5 units, as of the EIA-860M release for 2026-07.
Who owns Felton CSG PV1-5?
EIA-860M names Ecoplexus, Inc as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Felton CSG PV1-5 LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Ecoplexus, Inc here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Felton CSG PV1-5 LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Felton CSG PV1-5 still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.