E. Goenner Project CSG

E. Goenner Project CSG is a 1 MW solar farm in Sherburne County, Minnesota, operated by E. Goenner Community Solar LLC. EIA-860M lists 1 generating unit here, inside MISO. Its unit entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1 MW
1 MW net summer
Generating units
1
In service
2019
EIA plant ID
63175

Where it is

Loading map…
County
Sherburne County, Minnesota
Coordinates
45.464, -94.091
Balancing authority
MISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
E. Goenner Community Solar LLC
Primary energy source
Solar
Technologies
Solar Photovoltaic
Status
Operating

Every plant E. Goenner Community Solar LLC reports to EIA →

E. Goenner Project CSG: FAQ

Where is E. Goenner Project CSG?
In Sherburne County, Minnesota (MN). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is E. Goenner Project CSG?
1 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns E. Goenner Project CSG?
EIA-860M names E. Goenner Community Solar LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as E. Goenner Project CSG LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — E. Goenner Community Solar LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "E. Goenner Project CSG LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is E. Goenner Project CSG still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.